RealRPT

Your condition period is 5–7 days. The document package is 300–800 pages.

RealRPT turns strata minutes, disclosure statements, title searches, inspection reports, and your contract into one structured, cross-referenced report — delivered in 24–48 hours, with a page reference for every flag.

How it works

1

Upload

Send us the documents from your realtor: strata package, PDS, title search, inspection report, contract.

2

We review

Technology reads every page; an experienced reviewer applies BC-specific judgment and cross-references all documents against each other.

3

You get clarity

A structured report within 24–48 hours: what the documents say, where they say it, and exactly what to ask your lawyer and inspector before subject removal.

Why cross-referencing matters

The most valuable findings live between documents. A disclosure statement that says no water issues. An inspection noting basement efflorescence. Strata minutes mentioning envelope work. Read separately, three minor notes — read together, a pattern your professionals need to see. One reviewer holding all your documents is the entire point.